Cardiff 131 - another milestone

Great progress continues on 131. The traction and lighting wiring is now complete and has been tested at low voltage. The good news is that both axles turned in the same direction and 131 has moved under its own power.
1. A new trolley head has been manufactured to old designs and is now being assembled.
2. 131's roof showing the trolley pole - this picture was taken from Glasgow 22's balcony.
3. The as new B510 controller at the north end. 4. The north end platform.