History of the National Tramway Museum

Tuesday, November 04, 2008

Winter

1. My first picture of the closed season at 9:15 this morning.
2. Sandwiches for lunch now.


3. The tower wagon is having its hydraulic systems checked.
4. The diesel engine GMJ is to have a paint job completed.
Both these vehicles may have a role to play later in the track reconstruction at Wakebridge.


Posted by Picasa

No comments:

Post a Comment