History of the National Tramway Museum

Tuesday, December 02, 2008

Wakebridge 25th November

1. Holes were being drilled in the north end concrete base and metal rods inserted into them.
2. A meeting in the Octogan to confirm the details of the project plan for rail welding.
3. Setting up the metal shuttering for the southbound centre section.
4. Removing the shuttering from the south end concrete base.
Posted by Picasa

1 comment:

  1. Nice to see the Wakebridge Tea shop does get used!

    ReplyDelete