History of the National Tramway Museum

Wednesday, October 28, 2009

Town End 23rd October



1&2. By Friday afternoon the filling and levelling was virtually complete.
3. I think that the work so far is a credit to the Museum and the Outside Works staff.

4. Big boys' toys.
The next stage of the project is lay the concrete base for the pointwork as was done at Wakebridge last year.
Posted by Picasa

No comments:

Post a Comment