Saturday, September 12, 2009

Workshop and overhead line

1. Work continues on LUT 159's body and paintwork with decorative patterns on the staircase.
Posted by Picasa
2. As reported last week, Leeds 180 has been reunited with its truck.
3. Balfour Beatty carried out a comprhensive inspection of the overhead line during the first half of the week. I didn't see this man sized cherry picker in action.
4. The wire alignment for pantographs and bow collectors was recorded using a video camera. Berlin 3006 towed Paisley 68 which acted as a mobile inspection platform.

No comments:

Post a Comment