


The overhead wiring at Crich has to cater for a variety of different current collectors leading to compromises that would not be needed on standardised tramways. A new by-pass wire to lower bow collectors has been installed at Glory Mine. The pictures show 602's bow collector entering and leaving the by-pass.
You may need to enlarge the picture to see the detail.

No comments:
Post a Comment