![](http://photos1.blogger.com/blogger/205/2355/400/IMG_0570.jpg)
![](http://photos1.blogger.com/blogger/205/2355/400/IMG_0566.0.jpg)
![](http://photos1.blogger.com/blogger/205/2355/400/IMG_0568.jpg)
The overhead wiring at Crich has to cater for a variety of different current collectors leading to compromises that would not be needed on standardised tramways. A new by-pass wire to lower bow collectors has been installed at Glory Mine. The pictures show 602's bow collector entering and leaving the by-pass.
You may need to enlarge the picture to see the detail.
![Posted by Picasa](http://photos1.blogger.com/pbp.gif)
No comments:
Post a Comment