Seven photos taken on 28 March showing the trams on duty for the first day.
630 was the first passenger tram to go on the new track layout.
The Forge shop looks very welcoming. The showcase/table contains the bellows used with the forge.
The new Pram and Buggie Shelter was really needed in the rain!
No comments:
Post a Comment