Saturday, January 17, 2009

Wakebridge 12th January

Monday, 12th was cold, wet and miserable.
1. Some of the undergrowth to the left of the track has been tidied up and the track has been slewed to give a straight approach to the points.

2 - 4. Now that the track has been aligned and levelled, Balfour Beatty were installing drain pipes in the pouring rain.


Posted by Picasa

No comments:

Post a Comment