The weather was better on Tuesday. In the morning the diesel engine, GMJ, and the Glasgow cable car trailer sucessfully navigated the new tack. In mid-afternoon GMJ returned to Wakebridge this time towing Sheffield 330. This was a time consuming journey on the very greasy rail.
1. Approaching the south points.
2. Passing over the south points.
3. Part way round the curve. Note that the power was off and 330's trolley tied down.
4. Approaching the north points.
No comments:
Post a Comment