There will be another Working Weekend in the workshop this coming weekend - 24th and 25th January.
1. The lining out and lettering on Cardiff 131 is now complete prior to varnishing. (more pictures tomorrow)
2. A pattern for the upper deck seats on London United 159.
3. MET 331 was re-united with its bogies last weekend and the brake rigging etc is now being connected.
1. The lining out and lettering on Cardiff 131 is now complete prior to varnishing. (more pictures tomorrow)
2. A pattern for the upper deck seats on London United 159.
3. MET 331 was re-united with its bogies last weekend and the brake rigging etc is now being connected.
4. Leeds 399 is being commissioned.
No comments:
Post a Comment