1. My first picture of the closed season at 9:15 this morning. 2. Sandwiches for lunch now. 3. The tower wagon is having its hydraulic systems checked. 4. The diesel engine GMJ is to have a paint job completed. Both these vehicles may have a role to play later in the track reconstruction at Wakebridge.
No comments:
Post a Comment