By Wednesday morning all of the track to be replaced had been lifted and the next job is to dig down for the new track foundations. The JCB soon uncovered a number of stone blocks that were used to fasten the track on the original mineral railway. These were moved from the construction site for examination and sure enough a piece of the old track from the Library fitted.
No comments:
Post a Comment